请帮忙英文翻中文Develop an Engineering change control procedure for
来源:学生作业帮 编辑:神马作文网作业帮 分类:英语作业 时间:2024/10/06 20:31:03
请帮忙英文翻中文
Develop an Engineering change control procedure for Process parameters changes after PPAP.No changes can be made to process parameters after without going through a formal change management.During the formal change management they you must verify the proposed changed does not have a negative impact to dimensions or visual aspects.Your team must also review with their customer.
Develop an Engineering change control procedure for Process parameters changes after PPAP.No changes can be made to process parameters after without going through a formal change management.During the formal change management they you must verify the proposed changed does not have a negative impact to dimensions or visual aspects.Your team must also review with their customer.
开发一个工程变更控制过程工艺参数变化在生产件批准程序之后.任何更改后工艺参数可以不经过正式的变更管理.在正式的变更管理他们必须验证拟议的改变没有维度或视觉方面产生负面影响.你的团队也必须和他们的客户一起审查.
请帮忙英文翻中文Develop an Engineering change control procedure for
帮忙英文翻成中文Develop master samples for the electrical test statu
请帮忙将中文翻译成英文
请帮忙将几句中文翻译成英文
请帮忙将此英文翻译成中文:Many thanks for the follow-up and suggestions.
英语翻译请帮忙翻译下列句子.Actually all languages change and develop when
请英文高手帮忙将这段中文翻译成英文.
quality control procedure是什么意思
英语翻译请将下面的英文翻译成中文Pollution is the price we pay for an overpop
Process engineering and control of fuel cells,prospects for
请高手帮忙把如下中文翻译成英文
有一句中文,请帮忙翻译成英文!急~~~