英语翻译This works covers the requirements and conditions for th
来源:学生作业帮 编辑:神马作文网作业帮 分类:英语作业 时间:2024/11/11 07:31:20
英语翻译
This works covers the requirements and conditions for the design and construction of surface drains,drain channel,subsoil drains,perimeter drain,pipe culverts,box culverts,sumps,sluice gate,other drainage structures,excavation and backfilling for drainage works.
All works shall conform to the standards given in the Urban Drainage Design Standards and Procedures for Peninsular Malaysia,Procedure No.1 planning and Design,issued by the Ministry of Agriculture,Malaysia and other relevant authorities and local by-laws requirements.
This works covers the requirements and conditions for the design and construction of surface drains,drain channel,subsoil drains,perimeter drain,pipe culverts,box culverts,sumps,sluice gate,other drainage structures,excavation and backfilling for drainage works.
All works shall conform to the standards given in the Urban Drainage Design Standards and Procedures for Peninsular Malaysia,Procedure No.1 planning and Design,issued by the Ministry of Agriculture,Malaysia and other relevant authorities and local by-laws requirements.
This works covers the requirements and conditions for the design and construction of surface drains,drain channel,subsoil drains,perimeter drain,pipe culverts,box culverts,sumps,sluice gate,other drainage structures,excavation and backfilling for drainage works.
该工程包括地表排水沟、排水渠、地下排水沟、周边排水沟、管涵、箱涵、集水井、闸门、其他排水结构、排水工程的开挖与回填等的设计与施工的要求和条件
All works shall conform to the standards given in the Urban Drainage Design Standards and Procedures for Peninsular Malaysia,Procedure No.1 planning and Design,issued by the Ministry of Agriculture,Malaysia and other relevant authorities and local by-laws requirements.
所有工程应符合马来西亚农业部颁发的“城市排水设计标准与马来西亚半岛程序-1号程序:规划和设计”给出的标准及其他有关当局和地方议事程序的要求.
该工程包括地表排水沟、排水渠、地下排水沟、周边排水沟、管涵、箱涵、集水井、闸门、其他排水结构、排水工程的开挖与回填等的设计与施工的要求和条件
All works shall conform to the standards given in the Urban Drainage Design Standards and Procedures for Peninsular Malaysia,Procedure No.1 planning and Design,issued by the Ministry of Agriculture,Malaysia and other relevant authorities and local by-laws requirements.
所有工程应符合马来西亚农业部颁发的“城市排水设计标准与马来西亚半岛程序-1号程序:规划和设计”给出的标准及其他有关当局和地方议事程序的要求.
英语翻译This works covers the requirements and conditions for th
英语翻译This specification sets forth the requirements for a die
英语翻译This study covers the world outlook for manufacturing sp
英语翻译This agreement covers the initial contract and shall inc
英语翻译The fundamental conditions and resources for health are
英语翻译that the amount of such claim(s) represent and covers th
英语翻译This specification establishes the general requirements
英语翻译The specification therefore reflects the requirements th
英语翻译This book covers the skills and tools you will need to c
英语翻译For All Sorts and Conditions of MenO God,the creator and
英语翻译Any provision contained in these Terms and Conditions th
英语翻译Working conditions – Working Hours and CompensationDo th