英语翻译
烟台天鸿时代广场基坑支护结构设计与施工
摘要:[摘 要]
基坑开挖后,对基坑进行必要的支护,对工程的顺利施工起着非常重要的作
用.本工程中,通过对土压力的计算,对周围环境的研究,决定采用锚杆加排桩的支护方式.施工过程中,监测不可缺少,现场监测有助于及时发现可能发生危险的先兆,判断工程的安全性,防止工程破坏事故的发生,以便采取必要的工程措施;以监测的结果指导现场施工,进行信息化反馈优化设计,使设计达到优质、安全.烟台地区地下水位较浅,还要采取降水和其他必要措施以保证施工过程中不会出现涌水、流砂及其引起的地面沉陷.
烟台天鸿时代广场基坑支护结构设计与施工
摘要:[摘 要]
基坑开挖后,对基坑进行必要的支护,对工程的顺利施工起着非常重要的作
用.本工程中,通过对土压力的计算,对周围环境的研究,决定采用锚杆加排桩的支护方式.施工过程中,监测不可缺少,现场监测有助于及时发现可能发生危险的先兆,判断工程的安全性,防止工程破坏事故的发生,以便采取必要的工程措施;以监测的结果指导现场施工,进行信息化反馈优化设计,使设计达到优质、安全.烟台地区地下水位较浅,还要采取降水和其他必要措施以保证施工过程中不会出现涌水、流砂及其引起的地面沉陷.
Topic :Yantai Tianhong Times Square Excavations Design and Construction
After the excavation of the pit to conduct the necessary support to the smooth construction of the project played a very important role.The project,a pair of earth pressure through the calculation of environmental studies to determine bolt increase pile supporting patterns.Construction process,not a lack of monitoring,on-site monitoring to detect possible danger signs,judgment of the security,to prevent damaged incidents,in order to take the necessary measures to the project; The results of the monitoring to the scene to guide the construction,information feedback optimization of the design,to make it possible to design high-quality,and safety.Yantai shallow groundwater,precipitation and also take other necessary measures to ensure that the construction process will not be gushing water.flow of sand and ground subsidence.
After the excavation of the pit to conduct the necessary support to the smooth construction of the project played a very important role.The project,a pair of earth pressure through the calculation of environmental studies to determine bolt increase pile supporting patterns.Construction process,not a lack of monitoring,on-site monitoring to detect possible danger signs,judgment of the security,to prevent damaged incidents,in order to take the necessary measures to the project; The results of the monitoring to the scene to guide the construction,information feedback optimization of the design,to make it possible to design high-quality,and safety.Yantai shallow groundwater,precipitation and also take other necessary measures to ensure that the construction process will not be gushing water.flow of sand and ground subsidence.
英语翻译烟台天鸿时代广场基坑支护结构设计与施工摘要:[摘 要]基坑开挖后,对基坑进行必要的支护,对工程的顺利施工起着非常
工地施工施工开挖基坑深度超过多少米时应进行专项支护设计?
基坑开挖大放坡与基坑开挖支护有什么区别
深基坑开挖的施工方案?
英语翻译钢板桩施工是指在运用钢板桩在施工的过程中到达基坑支护的作用的施工过程.通过昆山市中环快速化改造工程钢板施工实例,
超过几米深的基坑为深基坑,需要做支护
基坑开挖深度9.24米.如何进行深基坑专家论证以及具体的步骤,还有就是深基坑开挖专项施工方案
开挖深度6米的深基坑的施工方案
基坑超过几米的土方开挖工程,应单独编制安全专项施工方案
基槽开挖有哪些支护方法?一般的基坑开挖有哪些支护方法?请分别划出支护结构简图.
开挖过程会产生流砂现象的深基坑应该采用哪种支护结构
沟槽开挖与支护的施工方案内容有哪些?