英语翻译
Service Level Requirements
(a) Fill-Rate details the number of orders received each day,the number and percentage of orders shipped the day the order was received,the number and percentage of orders shipped within 72 hours of receipt,and the number of orders that have not shipped.Fill rates are calculated as follows:the total number of orders submitted divided into the total number of shipments of those orders within 72 hours.Ninety Eight percent (98%) of all part orders received by SELLER shall be shipped within 72 hours of receipt of the Part order from BUYER (or its designee),excluding Saturdays,Sundays and locally recognized holidays.
(b) Back-Order.When a part order cannot not be shipped within the fill-rate requirements,it is then deemed as a back-ordered part.The following questions should be answered to help determine back-order status
• Can the part ship within 72 hours.
• Is there a viable substitute/universal part available in place of the original.
• Does another solution exist to repair the unit
SELLER shall provide a Backorder Report on a weekly basis to BUYER listing all part orders that have not been shipped and contain at minimum the following information:
• Service Order number
• Vendors Sales Order number
• Part number on order
• Description of part number
• ETA,which is the date that SELLER estimates the part(s) will arrive at the address specified by the order.
英语翻译Service Level Requirements(a) Fill-Rate details the numb
Service Level Requirements
服务质量要求
(a) Fill-Rate details the number of orders received each day,the number and percentage of orders shipped the day the order was received,the number and percentage of orders shipped within 72 hours of receipt,and the number of orders that have not shipped.Fill rates are calculated as follows:the total number of orders submitted divided into the total number of shipments of those orders within 72 hours.Ninety Eight percent (98%) of all part orders received by SELLER shall be shipped within 72 hours of receipt of the Part order from BUYER (or its designee),excluding Saturdays,Sundays and locally recognized holidays.
订单满足率记录了每天收到的订单数量,收到订单的装船数量和装船率,收到的订单在72小时内的装船数量和装船率以及没有装船的订单数量.根据以下方法计算订单满足率:提交的订单总数被分为72小时内的装船总数.卖方收到买方(或委托人)货物订单后,98%的订单应在72小时内装船,周六、周日以及法定假日除外.
(b) Back-Order.When a part order cannot not be shipped within the fill-rate requirements,it is then deemed as a back-ordered part.The following questions should be answered to help determine back-order status
• Can the part ship within 72 hours.
• Is there a viable substitute/universal part available in place of the original.
• Does another solution exist to repair the unit
延期订单.如果货物订单不能按期装船交货,即被认为是延期订单产品.延期订单状态通过以下几个问题确认:
• 能否在72小时内装船
• 原产地是否有合适的替代品/通用备件.
• 是否有其他方案来解决问题.
SELLER shall provide a Backorder Report on a weekly basis to BUYER listing all part orders that have not been shipped and contain at minimum the following information:
• Service Order number
• Vendors Sales Order number
• Part number on order
• Description of part number
• ETA,which is the date that SELLER estimates the part(s) will arrive at the address specified by the order.
卖方应每周向买方提供延期交货报表,列出尚未装船的订单.报表至少包含下列信息:
• 服务单编号
• 供应商销售订单号
• 订单产品/零件编号
• 订单产品零件描述
• 预计到达时间,即 卖方估计把货物运到订单指定地点的日期.