英语翻译如果要final carton box design 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星
来源:学生作业帮 编辑:神马作文网作业帮 分类:英语作业 时间:2024/10/02 08:36:25
英语翻译
如果要final carton box design 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星期的时间.我建议等你收到样机并确认之后,我们马上开始为你设计,
另外,我之前好像没有确认腔体要使用不锈钢材质,我在报价里也只写了white painted,正常来说,solo function 一般标配 white painted .如果你一定要改,我需要问下工厂是否可以做到,因为毕竟,34L不锈钢要比白色一般贵3-4美金.
总之,如果以后你的任何样机需要做到:红色LED+logo+final carton box design,我想至少要1个半月的时间来进行,我认为这样很费时间,请谅解.
如果要final carton box design 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星期的时间.我建议等你收到样机并确认之后,我们马上开始为你设计,
另外,我之前好像没有确认腔体要使用不锈钢材质,我在报价里也只写了white painted,正常来说,solo function 一般标配 white painted .如果你一定要改,我需要问下工厂是否可以做到,因为毕竟,34L不锈钢要比白色一般贵3-4美金.
总之,如果以后你的任何样机需要做到:红色LED+logo+final carton box design,我想至少要1个半月的时间来进行,我认为这样很费时间,请谅解.
Only when final carton box design have to place the order to the factory,they will schedule to design, this need about 2-3 weeks. I suggest that after you have received the prototype and confirmed it do we immediately began to design for you, is that ok?
In addition, I didn't confirm the cavity would made of stainless steel material before, I only wrote in the quotation with white painted, normally, solo function is generally made up of white painted in standard. If you have to change, I need to ask the factory whether they can do it, because, after all, 34 L stainless steel is 3-4 dollars more than white painted.
In short, if you have any prototype need to do : red leds + logo + final carton box design, I need at least one and half months to finish it, I think it takes huge time, wish your understanding.
如果要进行最后的包装设计, 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星期的时间. 我建议等你收到样机并确认之后,我们马上开始为你设计,这样行吗?
另外,我之前好像没有确认腔体要使用不锈钢材质,我在报价里也只写了漆成白色,正常来说,单独功能一般标配是刷白漆 .如果你一定要改,我需要问下工厂是否可以做到,因为毕竟,34L不锈钢要比白色一般贵3-4美金.
总之,如果以后你的任何样机需要做到:红色LED+商标+最后纸箱设计, 我想至少要1个半月的时间来进行,我认为这样很费时间,请谅解.
In addition, I didn't confirm the cavity would made of stainless steel material before, I only wrote in the quotation with white painted, normally, solo function is generally made up of white painted in standard. If you have to change, I need to ask the factory whether they can do it, because, after all, 34 L stainless steel is 3-4 dollars more than white painted.
In short, if you have any prototype need to do : red leds + logo + final carton box design, I need at least one and half months to finish it, I think it takes huge time, wish your understanding.
如果要进行最后的包装设计, 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星期的时间. 我建议等你收到样机并确认之后,我们马上开始为你设计,这样行吗?
另外,我之前好像没有确认腔体要使用不锈钢材质,我在报价里也只写了漆成白色,正常来说,单独功能一般标配是刷白漆 .如果你一定要改,我需要问下工厂是否可以做到,因为毕竟,34L不锈钢要比白色一般贵3-4美金.
总之,如果以后你的任何样机需要做到:红色LED+商标+最后纸箱设计, 我想至少要1个半月的时间来进行,我认为这样很费时间,请谅解.
英语翻译如果要final carton box design 必须要下单给工厂,他们才会安排设计,这样需要大概2-3个星
英语翻译MBL HBL的正本提单均已寄至你方,如果要船公司更改内容重新出单,就必须要提供他们之前出的那份正本提单,请知悉
做外贸跟单必须要会英文吗?
成就感必须要事情成功了才会产生吗?
英语翻译2L 今年才刚投入市场,8L暂时还在完善中,所以最快也要明年3年份才能安排大货 base on 你必须要告知我们
必须要分下.
英语翻译如果我们现在重新订购材料,需要1个月的交期,那么我们会赶不上交货期,而且原来的材料也需要付开模费用给工厂,这个代
英语翻译如果我们想收获成果,就必须要付出艰辛的努力.即使在困难,我们也要努力,克服它.只有这样我们才能成功.
英语翻译谢谢你及时的回复前提是必须要在3月底下订单,这样我们才能保证60天的交货时间.
帮忙回答下,必须要正确答案,给30分.
box ,shipping carton ,outer carton,
地球上的物体要飞离地球的吸引力必须要达到一定的速度才行,那如果